A few of our Projects
We provide a wide range of professional services to meet your needs. We promise to provide every service with a smile, and to your highest level of satisfaction.
OSET WATER
TREATMENT PLANT
Project: New Water Treatment Plant Completion
Date: 2008
Cost: $600 million NOK (approx. $67 million USD)
Design
• Capacity: 390,000 m3/day
• Provide drinking water to 85% of population of Oslo
• Construction: Two 750 m long, 28 m wide and 76 m high cavern halls
WIGGINS ISLAND COAL
EXPORT TERMINAL
Project: New Export Terminal Completion
Date: 2015
Cost: $3.3 billion USD
Design
• Capacity: 27 million tonnes per annum (mtpa)
• A rail receival facility designed to handle a maximum throughput of 8,250 tons per hour(@ 900 kg/m3)
• 5.6 km long overland conveyor
• Stockyard capacity: 7.85 million tons of coal
• Materials handling and sampling systems feeding the 2km long jetty conveyor
• Single berth with a travelling ship loader to fill ships at 8,250 tonnes per hour
• Channels and wharf to accept a range of vessels from 40,000dwt to 220,000dwt
• 732 kV substation, access roads, workshops, administration offices and amenities
MARINE TERMINALS
Many of our large projects include a marine terminal for Import/Export purposes.
Examples:
• LNG
o CNL Quintero (Chile)
o Peru LNG (Peru)
o Isle of Crain LNG (UK)
o Golden Pass LNG (USA)
• Mining
o Goro Nickel (New Caledonia)
o Koniambo Nickel (New Caledonia)
PLUTO LNG
Project: Pluto LNG
Date: 2008-2009, 2015
Works Include: EPC project Bulk storage tanks, LPG spheres, Offshore Platform, Onshore Gas Train 1 & 2 FW
Maersk PEREGRINO FPSO
Project: FPSO
Date: 2009
Works Include: Systems Completion &
Turnover/handover (RFO), Commissioning advisor
PEARL GTL
Project: Integrated gas and gas-to-liquids project
Date: 2009
Works Include: Systems Completion & Turnover/Handover (RFO), Commissioning advisor
NORTH RAKIN
RE-DEVELOPMENT PROJECT
Project: FPSO
Date: 2010
Works Include: Inspection Services, Systems Completion & Turnover/Handover (RFO), Commissioning, Certification
BRIDGEWATER
HYDROELECTRIC STATION
Project: Hydroelectric Power Station
Date: 2010
Works Include: Systems Completion, Certification &
Turnover/Handover (RFO), Preservation
VOGTLE NUCLEAR UNIT 3 & 4
Project: New Build AP700 Nuclear Power Plant
Date: 2014
Works Include: Systems Completion, Certification &
Turnover/Handover (RFO), Preservation - Start-up
JOHN W. TURK JR.
POWER PLANT
Project: New Build 650 MW Ultra super critical Plant
Date: 2007
Works Include: Systems Completion, Certification &
Turnover/Handover (RFO), Preservation
JIMBLEBAR PROJECT
Project: Open-Cut Pit Iron Ore Mine
Date: 2013
Works Include: Inspection Services, Systems Completion
& Turnover/Handover (RFO), Commissioning, Certification
OYU TOLGOI PROJECT
Project: One of the Largest Copper and Cold Mine
Date: 2010
Works Include: Systems Completion, Certification &
Turnover/Handover (RFO), Preservation
MA'ADEN ALUMINUM
PROJECT
Project: Mine
Date: 2010
Works Include: Systems Completion, Certification &
Turnover/Handover (RFO), Preservation
Working with Complan has been a game-changer for our business. Their team was able to quickly understand our project requirements and provide customized solutions that helped us streamline our processes and improve our overall efficiency.
C. Lang
Project Execution Consultant
Interested in our services? We’re here to help!
We want to know your needs exactly so that we can provide the perfect solution. Let us know what you want and we’ll do our best to help.