Blog Layout

Adriatic LNG receives its 1000th shipment

Cailean Gysler • Apr 03, 2023

Adriatic LNG Celebrates 1,000th Shipment Milestone with WinPCS

Adriatic LNG, the first offshore LNG regasification terminal in the Mediterranean, recently celebrated a significant milestone with the arrival of its 1,000th shipment. The terminal has played a key role in diversifying Europe's gas supplies and meeting its growing demand for natural gas. This success is a testament to the ingenuity of the project team, the quality of the engineering design, and the reliability of the project's completions system - WinPCS.


Adriatic LNG is a joint venture between Qatar Petroleum, ExxonMobil, and Edison. It began operations in 2009 and has since delivered more than 80 billion cubic meters of natural gas to Italy and other European countries. The terminal has a regasification capacity of 8 billion cubic meters per year and consists of a floating storage and regasification unit (FSRU), a subsea pipeline system, and an onshore gas pipeline.


To ensure the smooth and efficient commissioning and start-up of the Adriatic LNG terminal, the project team relied on WinPCS, a comprehensive completions and commissioning software system developed by Complan. WinPCS is a web-based tool that provides a complete suite of tools for managing the completions process, including punch listing, progress tracking, and reporting.


WinPCS enabled the project team to manage the thousands of commissioning and start-up activities across all project phases, from construction through to handover. The software helped to ensure that all activities were completed on time and to the required quality standards, minimizing the risk of delays and cost overruns.


The success of the Adriatic LNG terminal is a testament to the importance of using advanced engineering tools and software systems to manage complex projects. The project team's ability to leverage the capabilities of WinPCS helped to ensure that the project was delivered on time, within budget, and to the required quality standards.


Complan is proud to have played a role in the success of the Adriatic LNG terminal and to have contributed to the project's safe and efficient operation over the past decade. As a leading provider of completions and commissioning software systems, Complan is committed to helping clients achieve their project goals and deliver world-class facilities.


Read the Article here: https://lngprime.com/lng-terminals/italys-adriatic-lng-terminal-gets-1000th-cargo/76042/


16 Feb, 2023
There are several factors that can contribute to the success of an industrial construction project
16 Feb, 2023
Relational Databases group systems and subsystems for better processes
16 Feb, 2023
Outsourcing your commissioning and completions team could have huge rewards
Share by: